SOLUTIONS FOR REAL SPACES

Designed for the space.
Built around operations.

Select a solution around the space, airflow, occupancy and maintenance capacity, with clear objectives, scope and review criteria.

Office & hospitalityPublic spacesVehicle cabins
Solutions — FCB brand concept visual
Existing brand concept artworkFOREST CURE BIOTECH
01

Offices and commercial buildings

Assess odour, ventilation and maintenance needs in meeting rooms, receptions and lift lobbies. Run zone-based pilots aligned with building operations and record equipment use, replenishment and feedback.

01

Implementation

Zoning, operating schedules and facilities-team training.

02

Review measures

User feedback, maintenance workload and agreed air-testing measures.

Sources: Work Case香港.pdf

02

Hotels and hospitality

Define odour-management needs and cleaning routines for lobbies, corridors and guest rooms. Begin in representative areas and assess expansion using operating records.

01

Shared areas

Consider airflow, guest movement and access for maintenance.

02

Guest rooms

Select products around occupancy, feedback and ventilation.

Sources: 浙江福思凯生物科技有限公司【产品矩阵】_2025.pptx

03

Shared areas in healthcare facilities

Assess environmental-management needs in waiting areas, corridors and offices. The facility team determines suitability, placement and maintenance within its existing ventilation, cleaning and infection-control procedures.

04

Schools and education

The institution evaluates products and scope in relation to occupant age, activity patterns, room use and ventilation. Clear instructions, training and feedback support daily management.

05

Vehicle-cabin development

A 2026 cabin proposal explores integrating FCB materials with vehicle air systems. Development discussions can cover compatibility, integration, environmental evaluation and maintenance. Vehicle models, production status and performance require project-specific confirmation.

Sources: FCB介绍 新能源汽车_健康座舱解决方案_20260605.pptx

06

Define your project

  1. 01

    Brief

    Space, scale and existing operations.

  2. 02

    Assessment

    Airflow, placement and maintenance access.

  3. 03

    Pilot

    Configuration, training and documentation.

  4. 04

    Review

    Evaluation, maintenance and next steps.